Insulation was finished on the floor and the sub-floor was
installed and completed with plywood. The framing for the South wall and the
interior framing for the core were completed as well. The team continues to
work very hard on building the deck modules. Also, the storage POD arrived
today. Now we are going to be able to safely leave all the materials secured
from rain during non-working hours.
The university gave us an awesome surprise of putting up a
BILLBOARD congratulating the students for this amazing project!
|
|Sub-floor Installed |
|
Storage POD arriving on site |
|
Core Interior Framing DONE |
|
BILLBOARD UP! Congratulation Students |
gotta love the billboard :D
ReplyDeleteGO TEAM!